|
Construction Log for RV-7 N395CL - Elevators - 10/26/07 - 11/20/07
Drilling the Stiffeners
Back-Rivetting Stiffeners (Right)
Back-Rivetting Stiffeners (Left)
Bending the Trailing Edge
Trailing Edge - Even across the surface
Skelton Assembly
Right Elevator Skeleton - Initial Assembly
Right Skeleton - Drilling Skin
Riveting Skeleton - Note Dimples as opposed to call out for countersinking
Completed Right Skeleton
Sealed stiffeners with Silicone and riveted assembly.
Completed Right Elevator. Finally - the first near flawless subcomponent of the plane. (Not that the others were bad, I'm just a perfectionist.)
Drilling out Left Elevator Skin
Riveted Right Elevator Skelton
Elevator Tab Bends
Looks pretty good!!!
Nice and square and should allow for the 3/32" gap between the elevator and the tab
That's about as good as I could get it - not bad at all.
GE Silicon 2 for Aluminum - seals the ends of the stiffeners to prevent cracks
Riveted Right Elevator skin
Blind Riveted the R Elevator bends Remaining log entries for the elevators are in the "trim tab" section _________________________________________________________________________________________________
|